Made in Chaves County, New Mexico

We're building the machinesthat power the AI age.

Fuel cells. Transformers. Battery storage. Zenith Volts Manufacturing is the factory side of Zenith Volts — designing American power hardware, starting with the equipment our own Roswell campus needs.

The thesis

The AI build-out is short on power hardware, not ideas. We are building the factory to supply the demand.

Every new data center needs power equipment that the market can't deliver fast enough. Transformers are experiencing year-plus lead times. Firm, clean, around-the-clock power is the hardest thing to buy.

Zenith Volts is answering by making its own supply. One parent, one campus, one supply chain: we design the equipment, we build it in Chaves County, and our own campus is the first customer.

3
Product lines in development
8US
Provisional patent applications filed, Oct 2026
0YR
Manufacturing & workforce agreement with the county EDC
0GWh
Planned annual battery capacity
The flywheel

Our first customer is already in the plan.

Zenith Volts is developing an off-grid power and data campus on ranchland outside Roswell. Phase 1 is designed around 10 MW net of around-the-clock power, with 258 MWh of battery storage and fuel cells in reserve. Phase 2 grows it to 45 MW net. Every unit it needs is an order for the factory floor.

Captive demand

The campus build-out is the first order on the books — fuel cells, transformers and storage, sized from the project's own equipment list.

Proven at home first

Every unit is designed to run first on our own campus, in the New Mexico heat, before it is offered to anyone else.

Sold to the market

Then the same products go to data-center developers, utilities and solar builders facing years-long equipment queues.

Scale & export

Volume brings cost down, and the line expands — across the U.S. and into international markets.

Concept visualization · Hagerman fuel-cell line
01
Power generation

FC-40
Fuel Cell

A 40-foot solid-oxide power module designed for firm, around-the-clock power — no combustion, and designed with carbon capture built in, not bolted on after. Built to stand behind a solar-and-storage campus and keep the lights on through every night.

Format
40-ft ISO module
Output (design target)
500 kW-class net AC
Technology
Solid-oxide, non-combustion
Fuel
Natural gas or propane
CO₂
Capture-equipped by design
Power electronics
Grid-forming inverters
Patent pending · In development
Concept visualization · Transformer line
02
Power delivery

ZV-PT
Transformers

The equipment the whole industry is waiting on. ZV-PT is a three-phase, liquid-filled pad-mount and skid transformer family for solar stations, battery yards and data halls — designed around biodegradable natural-ester fluid and next-generation efficiency standards.

Ratings
500 kVA – 5 MVA
Voltage class
15 – 35 kV
Fluid
Natural ester (FR3)
Design basis
IEEE C57 · DOE 2029
First article
5 MVA power-station skid
Next generation
Dry-type & 10–60 MVA
Patent pending · In development
Concept visualization · Battery storage yard
03
Energy storage

Grid-Scale
Batteries

A battery factory planned around licensed cell technology, with Zenith owning the plant. The cells it makes are designed for the storage yards that carry a solar campus through the night — starting with our own.

Planned capacity
10 GWh / year
Technology
Licensed cell chemistry
Ownership
Zenith-owned factory
Incentives
Designed for §45X
First customer
Roswell campus storage
Planned · Technology license signed
Hagerman · Chaves County · New Mexico

Built here.
By people from here.

Zenith Volts signed a ten-year Manufacturing Investment, Local-Content & Workforce Development Agreement with the county's economic development corporation in July 2026. The factories are planned for Hagerman, with a training center to put local people on the line.

Roll-outDesigned to ship by rail
LogisticsRail in, rail out
Supply chainPrecision from Japan
WorkforceLocal crews
Supply chain

American steel.
World-class parts.

First units are sourced in the U.S., and the heavy steel stays American. At production rate, precision components are planned to come through partners in Japan — with domestic-content credit in view from day one.

The film

Made in Chaves County

Roadmap

From first article
to full line.

Stage 1

First articles

FC-40 first article and the 5 MVA ZV-PT power-station skid, built to the Roswell campus's own specifications.

Stage 2

Production lines

Hagerman assembly lines and battery factory ramp, with local hiring and training through the county agreement.

Stage 3

Next generation

Dry-type transformers, larger 10–60 MVA units, switchgear, and sales to outside customers at home and abroad.

Partner with us

Build it
with us.

We're talking with manufacturing investors, strategic partners, component suppliers and future customers. Tell us who you are and we'll be in touch.